Transforming Eswatini into a regional energy hub through the EESR Project.
Project OverviewAchieving 100% national self-sufficiency in petroleum, eliminating dependency on fuel imports.
Generating vital foreign exchange by serving as a central energy pillar for the SADC region.
Lowering industrial costs for manufacturing and agro-processing via local LPG production.
Located at Phuzumoya, our modular facility leverages the Goba railway to link Eswatini directly to the Port of Maputo for crude importation.
300k
Phase 1 BPSD
600k
Max Expansion
55%
Diesel (10ppm)
35%
Petrol (95 ULP)
3%
LPG Gas
4%
Paraffin/Jet A1
Chairman
Managing Director
Deputy Chairman
Office 144, African City Building, Mbabane, Eswatini